EAST FOREST HILL WATER MAIN PROJECT

 

 

Project Overview
 

Oak Creek Water and Sewer Utility’s East Forest Hill Water Main Project will be starting May 1st.  This project is intended to reduce the frequency and severity of water main breaks and disruption of service to local residents.  Work includes replacing the water distribution system water mains, valves, fire hydrants, and water services in your neighborhood.  The Utility has teamed with the City of Oak Creek to pave the full width of the roadway. 

Contractor:                                  UPI, LLC

Construction Coordinator:          Seth Ricker    (414) 570-8200 ext. 38

Utility Engineer:                            Ron Pritzlaff  (414) 570-8200 ext. 24

 

>>Project Updates and Information<<

 

PROJECT MAP

 

(Click Map for Enlarged View)

     

(Click Map for Enlarged View)