Oak Creek Water and Sewer
Utility’s East Forest Hill Water Main Project will be starting May 1st.
This project is intended
to reduce the frequency and severity of water main breaks and disruption of
service to local residents. Work includes replacing the water distribution
system water mains, valves, fire hydrants, and water services in your
neighborhood. The Utility has teamed with the City of Oak Creek to pave the
full width of the roadway.
Contractor: UPI,
LLC
Construction Coordinator: Seth Ricker
(414) 570-8200 ext. 38
Utility
Engineer: Ron Pritzlaff (414) 570-8200 ext. 24 |