04101 - Bid Tab

PROJECT NO. 04101 - S.T.H. 100 Water Main Relocation  
Bid Date:  July 9, 2004     Willkomm Excavating and Grading, Inc. Globe Contractors, Inc.
Item     Unit Total Unit Total
No. Item Description  Quantity   Price Price Price Price
1 16" water main, 3/4" TB backfill, surface restoration       525 LF $169.83 $89,160.75 $180.00 $94,500.00
2 6" water main, 3/4" TB backfill, surface restoration       120 LF $46.38 $5,565.60 $170.00 $20,400.00
3 1" lateral conection, 3/4" TB backfill, surface restoration       265 LF $59.55 $15,780.75 $125.00 $33,125.00
4 1" lateral connection, spoil backfill, surface restoration         25 LF $43.30 $1,082.50 $86.00 $2,150.00
5 16" butterfly valve           2 EA $1,641.52 $3,283.04 $1,900.00 $3,800.00
6 6" gate valve           3 EA $868.51 $2,605.53 $800.00 $2,400.00
7 Hydrant           2 EA $3,141.03 $6,282.06 $2,000.00 $4,000.00
8 Salvage and re-install hydrant           3 EA $1,620.00 $4,860.00 $5,000.00 $15,000.00
9 traffic control and access           1 LS $6,000.00 $6,000.00 $10,000.00 $10,000.00
10 wet connection           1 EA $3,171.67 $3,171.67 $10,000.00 $10,000.00
  TOTAL       $137,791.90   $195,375.00